.png)
Summary
I have
spent the last seven years starting up my own small company, GPS Precision
Grade. This has allotted me the opportunity to bring together the skills
and understanding that I have acquired as a grade checker and foreman over
the previous 25 years as a member of the Operating Engineer’s Union. I
have developed a comprehensive understanding the AGTEK and Carlson AutoCAD
software. Much of my work has involved calculating and analyzing earthwork
quantities for projects in development.
From
2003 to 2006 much of my work for Centex Homes, KB Homes and K. Hovnanian
Homes involved recording topographies of earthwork removals and keyways
with my GPS equipment then processing the data for reconciling quantities.
In
July 2005 I was contracted with Otay River Constuctors to create a precise
3D model of the HWY 54/125 interchange and the HWY 125 mainline and ramps.
This model was used to aid field layout and to guide GPS outfitted heavy
equipment.
In
August 2006 I began committing the majority of my time to consulting for
Rancho Mission Viejo through “GRIT” (Geomatic Resource Information Team).
This involved modeling preliminary project designs, future utilities as
well as the remedial grading analysis. These models were used to project
grading budgets and to better visualize the project. Also the 3D models
were merged with models of existing utilities and structures to assess
conflicts in the initial stages of plan development and expedite
modification without delays.
In May
2008 I began working again with Otay River Constuctors to assist in
reconciling the full project earthwork quantities and analyzing the
impacts of change orders and delays. The scope of my work included 3D
modeling of the final product as well as alternate concepts and
preliminary designs at critical benchmarks. These models were quantified
to be used as backup for claim submittals in conjunction with ORC’s in
house design team quantities where possible. Exhibits and 3D video
animations of the various designs and conflicts were created to backup
claims and assist in litigation.
In
July 2010 I was contracted Tri-Power Engineering and University Park, LLC
to record and model keyway topographies, and the documentation of
sub-drains and GeoGrid at the University Park project.
I
updated my website in 2011 and have added examples of my work, including
videos of 3D drive through animation.
Here you will also find some of
the completed projects with which I have recently been involved.
Please take some time to visit the site, check out the examples and
consider the applications to projects you may have coming up.
Thank you for your time and consideration,
Mike Palhegyi
(951) 906-7067
mike.gps@gmail.com